Sign In | Join Free | My gimpguru.org |
|
Brand Name : DAO
Place of Origin : Jiangsu, China
MOQ : 60m
Price : Variable
Payment Terms : T/T
Supply Ability : 400 km per year
Delivery Time : 18 working days
Packaging Details : Customized as required
Resin type : Polyester resin
Diameter : DN900
Thickness : 8mm
Length : 90m
Weight : Variable
Life : 50 years
UV liner for the trenchless repair of underground and municipal sewers pipelines
Method for preparation of UV CIPP process
Use a CCTV robot to thread a rope to pull the bottom membrane: (use a braided rope, do not replace the rope at will, otherwise, the material or membrane will rotate in the pipe) the connection buckle between the rope head and the bottom membrane should be firmly fastened, and another rope to pull the material should be placed on the upper end of the bottom membrane (if a winch is used, it is a steel wire rope).
Ensure that the material and rope are not mixed with the rotation of the bottom membrane during the membrane pulling process. For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.
Fixing method | Trenchless |
Method | CIPP |
Length | Any length is possible |
![]() |
Fiber Reinforced UV CIPP Lining cured in place pipe lining equipment uv led curing Images |