Sign In | Join Free | My gimpguru.org
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > UV CIPP Lining >

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig

Brand Name : DAO

Place of Origin : Jiangsu, China

MOQ : 10m

Price : Variable

Payment Terms : T/T

Supply Ability : 340 km per year

Delivery Time : 15 working days

Packaging Details : Normal

Material : Lining sewers

Diameter : DN300

Thickness : 3mm

Length : 460m

Weight : Variable

Life : 50 years

Contact Now

UV light curing inner repair sewer liner by CIPP process no need digging

The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside.

1-Protective film: the plastic film on the outermost layer of the hose to protect the hose from ultraviolet radiation and avoid scratches during storage, transportation, pulling, etc.

2-Outer membrane: the plastic film on the second outer layer of the hose. The outer film material is a complete barrel film without the interface, which can better protect the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and make the resin evenly distributed when the hose is inflated.

3-Glass fiber fabric: the main part of the hose is used to absorb the curing glue, increasing the pipe's strength after curing.

4-Inner membrane: the plastic film at the innermost layer of the hose, which protects the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and makes the resin as evenly distributed as possible when the hose is inflated. After the hose is cured, the inner membrane shall be pulled out of the inner liner.

How Plugging
Application Rain storm
Length Any length is possible

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig


Product Tags:

uv lining processing DAO

      

DAO uv pipes coating

      

DAO uv linings process

      
Quality UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig wholesale

UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)